Evaluations and Lessons Learned

Independent Evaluation Report - Rehabilitation of the Date Palm Sector, Iraq

Iraq dates evaluation report final 120214 png

The end-of project evaluation was initially planned as a joint UNIDO/FAO evaluation. Unfortunately, this joint approach had to be abandoned when the events in the region prevented the FAO evaluation expert from fulfilling his assignment. Moreover, these events delayed the finalization of the UNIDO evaluation which was initiated in November-December 2010. The present evaluation is therefore limited to the UNIDO component. It has been conducted by an international evaluation expert in cooperation with a national consultant who gathered information through desk research, stakeholder interviews and field missions. The evaluation methodology had to adapt to security constraints but efforts were made to triangulate findings to the extent possible.

Download main report file

Download file

Resource collections